You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Taxonomy: Difference between revisions
Jump to navigation
Jump to search
(11 intermediate revisions by the same user not shown) | |||
Line 216: | Line 216: | ||
::[http://petrowiki.org/Category:2.2.4_HPHT_completions_installation 2.2.4 HPHT completions installation] | ::[http://petrowiki.org/Category:2.2.4_HPHT_completions_installation 2.2.4 HPHT completions installation] | ||
::[http://petrowiki.org/Category:2.2.5_Deepwater_completions_installation 2.2.5 Deepwater completions installation] | |||
::[http://petrowiki.org/Category:2.2.6_Coiled_tubing_operations 2.2.6 Coiled tubing operations] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
:[http://petrowiki.org/Category:2. | :[http://petrowiki.org/Category:2.3_Completion_monitoring_systems_/_intelligent_wells 2.3 Completion monitoring systems/intelligent wells] | ||
::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring] | ::[http://petrowiki.org/Category:2.3.1_Remote_monitoring 2.3.1 Remote monitoring] | ||
Line 225: | Line 229: | ||
::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment] | ::[http://petrowiki.org/Category:2.3.2_Downhole_sensors_and_control_equipment 2.3.2 Downhole sensors and control equipment] | ||
::[http://petrowiki.org/Category:2.3. | ::[http://petrowiki.org/Category:2.3.3_Flow_control_equipment 2.3.3 Flow control equipment] | ||
::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization] | ::[http://petrowiki.org/Category:2.3.4_Real_time_optimization 2.3.4 Real time optimization] | ||
Line 231: | Line 235: | ||
::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management] | ::[http://petrowiki.org/Category:2.3.5_Completion_data_management 2.3.5 Completion data management] | ||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.3.6_Tubular_optimization 2.3.6 Tubular optimization] | ||
::[http://petrowiki.org/Category:2.3.7_Downhole_tools_and_equipment 2.3.7 Downhole tools and equipment] | |||
:[http://petrowiki.org/Category:2.4_Sand_control 2.4 Sand control] | |||
::[http://petrowiki.org/Category:2.4.3_Sand_/_solids_control 2.4.1 Sand/solids control] | |||
::[http://petrowiki.org/Category:2.4.4_Screen_Selection 2.4.4 Screen selection] | |||
::[http://petrowiki.org/Category:2.4. | ::[http://petrowiki.org/Category:2.4.5_Gravel_pack_design_&_evaluation 2.4.5 Gravel pack design & evaluation] | ||
::[http://petrowiki.org/Category:2.4. | ::[http://petrowiki.org/Category:2.4.6_Frac_and_pack 2.4.6 Frac and pack] | ||
:[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing] | :[http://petrowiki.org/Category:2.5_Hydraulic_fracturing 2.5 Hydraulic fracturing] | ||
Line 247: | Line 259: | ||
::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing] | ::[http://petrowiki.org/Category:2.5.4_Multistage_fracturing 2.5.4 Multistage fracturing] | ||
:[http://petrowiki.org/Category:2. | ::[http://petrowiki.org/Category:2.5.5_Re-fracturing 2.5.5 Re-fracturing] | ||
:[http://petrowiki.org/Category:2.6_Acidizing 2.6 Acidizing] | |||
:[http://petrowiki.org/Category:2.7_Completion_fluids 2.7 Completion fluids] | |||
::[http://petrowiki.org/Category:2.7.1_Completion_fluids 2.7.1 Completion fluids] | |||
::[http://petrowiki.org/Category:2.7.2_Formation_damage_during_completion 2.7.2 Formation damage during completion] | |||
:[http://petrowiki.org/Category:2.8_Completions_evaluation 2.8 Completions evaluation] | |||
:[http://petrowiki.org/Category:2.9_Recompletion 2.9 Recompletion] | |||
:[http://petrowiki.org/Category:2.10_Well_Integrity 2.10 Well Integrity] | |||
::[http://petrowiki.org/Category:2.10.1_Design_for_well_integrity 2.10.1 Design for well integrity] | |||
::[http://petrowiki.org/Category:2.10.2_Well_integrity_logging_and_monitoring 2.10.2 Well integrity logging and monitoring] | |||
::[http://petrowiki.org/Category:2.10.3_Zonal_isolation 2.10.3 Zonal isolation] | |||
::[http://petrowiki.org/Category:2.10.4_Subsurface_corrosion 2.10.4 Subsurface corrosion (tubing, casing, completion equipment, conductor)] | |||
:[http://petrowiki.org/Category:2.11_Fundamental_research_in_well_completion 2.10 Fundamental research in well completion] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 273: | Line 309: | ||
::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification] | ::[http://petrowiki.org/Category:3.1.8_Gas_well_deliquification 3.1.8 Gas well deliquification] | ||
:[http://petrowiki.org/Category:3. | :[http://petrowiki.org/Category:3.2_Well_operations_and_optimization 3.2 Well operations and optimization] | ||
::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition] | ::[http://petrowiki.org/Category:3.2.1_Well_candidate_recognition 3.2.1 Well candidate recognition] | ||
Line 279: | Line 315: | ||
::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing) | ::[http://petrowiki.org/Category:3.2.2_Downhole_intervention_and_remediation_(including_wireline_and_coiled_tubing) 3.2.2 Downhole intervention and remediation] (including wireline and coiled tubing) | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.3_Produced_sand/_solids_management_and_control 3.2.3 Produced sand/solids management and control] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.4_Produced_water_management_and_control 3.2.4 Produced water management and control] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.5_Downhole_fluids_separation,_management_and_disposal 3.2.5 Downhole fluids separation management and disposal] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.6_Well_performance_modeling 3.2.6 Well performance modeling] | ||
::[http://petrowiki.org/Category:3.2. | ::[http://petrowiki.org/Category:3.2.7_Lifecycle_management_and_planning 3.2.7 Lifecycle management and planning] | ||
::[http://petrowiki.org/Category:3.2.8_Well_performance_modeling_and_tubular_optimization 3.2.8 Well performance modeling and tubular optimization] | ::[http://petrowiki.org/Category:3.2.8_Well_performance_modeling_and_tubular_optimization 3.2.8 Well performance modeling and tubular optimization] | ||
Line 321: | Line 357: | ||
::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control] | ::[http://petrowiki.org/Category:3.4.5_Bacterial_contamination_and_control 3.4.5 Bacterial contamination and control] | ||
:[http://petrowiki.org/Category:3. | :[http://petrowiki.org/Category:3.5_Well_intervention 3.5 Well intervention] | ||
::[http://petrowiki.org/Category:3.5.1_Candidate_selection 3.5.1 Candidate selection] | |||
::[http://petrowiki.org/Category:3.5.2_Intervention_methods 3.5.2 Intervention methods] | |||
::[http://petrowiki.org/Category:3.5.3_Through_tubing_well_intervention 3.5.3 Through tubing well intervention] | |||
::[http://petrowiki.org/Category:3.5.4_Re-simulation_(excluding_re-fraccing) 3.5.4 Re-simulation (excluding re-fraccing)] | |||
::[http://petrowiki.org/Category:3.5.5_Water_shut-off 3.5.5 Water shut-off] | |||
:[http://petrowiki.org/Category:3. | ::[http://petrowiki.org/Category:3.5.6_Pump_repairs 3.5.6 Pump repairs] | ||
:[http://petrowiki.org/Category:3.6_Well_decommissioning 3.6 Well decommissioning] | |||
::[http://petrowiki.org/Category:3.6.1_Well_plug_and_abandonment_methods,_design_and_selection 3.6.1 Well plug and abandonment methods, design and selection] | |||
::[http://petrowiki.org/Category:3.6.2_Plugging_materials 3.6.2 Plugging materials] | |||
::[http://petrowiki.org/Category:3.6.3_Well_plug_and_abandonment_operations 3.6.3 Well plug and abandonment operations] | |||
::[http://petrowiki.org/Category:3.6.4_Rigless_plug_and_abandonment 3.6.4 Rigless plug and abandonment] | |||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 483: | Line 539: | ||
:[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization] | :[http://petrowiki.org/Category:5.1_Reservoir_characterization 5.1 Reservoir characterization] | ||
:: | ::[http://petrowiki.org/Category:5.1.1%20Exploration,%20development,%20and%20structural%20geology 5.1.1 Exploration, development, and structural geology]<br /> | ||
::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization] | ::[http://petrowiki.org/Category:5.1.2_Faults_and_fracture_characterization 5.1.2 Faults and fracture characterization] | ||
Line 585: | Line 639: | ||
::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD) | ::[http://petrowiki.org/Category:5.6.7_Formation_test_analysis 5.6.7 Formation test analysis] (e.g., wireline, LWD) | ||
::[http://petrowiki.org/Category:5.6. | ::[http://petrowiki.org/Category:5.6.8_Well_performance_monitoring,_inflow_performance 5.6.8 Well performance monitoring, inflow performance] | ||
::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting] | ::[http://petrowiki.org/Category:5.6.9_Production_forecasting 5.6.9 Production forecasting] | ||
Line 627: | Line 681: | ||
::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs] | ::[http://petrowiki.org/Category:5.8.8_Gas_condensate__reservoirs 5.8.8 Gas condensate reservoirs] | ||
::[http://petrowiki.org/Category:5.8. | ::[http://petrowiki.org/Category:5.8.9_Hp/_ht_reservoirs 5.8.9 Hp/ht reservoirs] | ||
:[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources] | :[http://petrowiki.org/Category:5.9_Non_traditional_resources 5.9 Non traditional resources] | ||
Line 637: | Line 691: | ||
:[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering] | :[http://petrowiki.org/Category:5.10_Storage_reservoir_engineering 5.10 Storage reservoir engineering] | ||
::[http://petrowiki.org/Category:5.10. | ::[http://petrowiki.org/Category:5.10.1_CO2_capture_and_sequestration 5.10.1 CO2 capture and sequestration] | ||
::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage] | ::[http://petrowiki.org/Category:5.10.2_Natural_gas_storage 5.10.2 Natural gas storage] | ||
Line 725: | Line 779: | ||
::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change] | ::[http://petrowiki.org/Category:6.5.7_Climate_change 6.5.7 Climate change] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.6_Sustainability/_social_responsibility 6.6 Sustainability/social responsibility] | ||
::[http://petrowiki.org/Category:6.6. | ::[http://petrowiki.org/Category:6.6.1_Integrating_HSES_into_the_business 6.6.1 Integrating HSES into the business] | ||
::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments] | ::[http://petrowiki.org/Category:6.6.2_Environmental_and_social_impact_assessments 6.6.2 Environmental and social impact assessments] | ||
Line 739: | Line 793: | ||
::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication] | ::[http://petrowiki.org/Category:6.6.6_Partnership_and_communication 6.6.6 Partnership and communication] | ||
:[http://petrowiki.org/Category:6. | :[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSES 6.7 Fundamental research in HSES] | ||
'''[[#Top|Back to top]]''' | '''[[#Top|Back to top]]''' | ||
Line 765: | Line 819: | ||
::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity] | ::[http://petrowiki.org/Category:7.1.8_Asset_integrity 7.1.8 Asset integrity] | ||
::[http://petrowiki.org/Category:7.1. | ::[http://petrowiki.org/Category:7.1.9_Project_economics/_valuation 7.1.9 Project economics/ valuation] | ||
::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ||
Line 823: | Line 877: | ||
==Data science and engineering analytics== | ==Data science and engineering analytics== | ||
'''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]''' | '''[[:Category:8 Information management and systems|8 Data science and engineering analytics]]''' | ||
:[http://petrowiki.org/Category:8.1_Information_management_systems 8.1 Information management and development and systems] | |||
::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management] | ::[http://petrowiki.org/Category:8.1.1_Knowledge_management 8.1.1 Knowledge management] |
Revision as of 15:46, 3 November 2020
Drilling
- 1.10.1 Drill string components and drilling tools (tubulars, jars, subs, stabilisers, reamers, etc)
- 1.11.2 Drilling fluid selection and formulation (chemistry, properties)
- 1.14.3 Cement formulation (chemistry, properties)
Completions
- 2.5.2 Fracturing materials (fluids, proppant)
Production and operations
- 3.2.2 Downhole intervention and remediation (including wireline and coiled tubing)
- 3.4.3 Corrosion inhibition and management (including H2S and CO2)
Projects, facilities, and construction
- 4.3.2 Precipitates (paraffin, asphaltenes, etc.)
- 4.3.3 Solids (scale, sand, etc.)
Reservoir
- 5.6.7 Formation test analysis (e.g., wireline, LWD)
- 5.6.10 Seismic monitoring (four dimensional)
Health, safety, environment, and sustainability
- 6.2.6 Infectious diseases (HIV/AIDS, malaria, tuberculosis)
- 6.3.1 Human factors (engineering and behavioral aspects)