You must log in to edit PetroWiki. Help with editing
Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information
Taxonomy: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 27: | Line 27: | ||
::[http://petrowiki.org/Category:1.3.3_Wellhead_integrity 1.3.3 Wellhead integrity ] | ::[http://petrowiki.org/Category:1.3.3_Wellhead_integrity 1.3.3 Wellhead integrity ] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:1.4_Drillstring_design 1.4 Drillstring design] | :[http://petrowiki.org/Category:1.4_Drillstring_design 1.4 Drillstring design] | ||
Line 77: | Line 77: | ||
::[http://petrowiki.org/Category:1.6.12_Plugging_and_abandonment 1.6.12 Plugging and abandonment] | ::[http://petrowiki.org/Category:1.6.12_Plugging_and_abandonment 1.6.12 Plugging and abandonment] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:1.7_Pressure_management 1.7 Pressure management] | :[http://petrowiki.org/Category:1.7_Pressure_management 1.7 Pressure management] | ||
Line 117: | Line 117: | ||
::[http://petrowiki.org/Category:1.9.5_Ranging_tools_and_proximity_calculation 1.9.5 Ranging tools and proximity calculation] | ::[http://petrowiki.org/Category:1.9.5_Ranging_tools_and_proximity_calculation 1.9.5 Ranging tools and proximity calculation] | ||
'''[[#Top|Back to top]]''' | |||
::[http://petrowiki.org/Category:1.10_Drilling_equipment 1.10 Drilling equipment] | ::[http://petrowiki.org/Category:1.10_Drilling_equipment 1.10 Drilling equipment] | ||
Line 149: | Line 149: | ||
::[http://petrowiki.org/Category:1.11.8_Drillling_fluid_property_measurement 1.11.8 Drilling fluid property measurement] | ::[http://petrowiki.org/Category:1.11.8_Drillling_fluid_property_measurement 1.11.8 Drilling fluid property measurement] | ||
'''[[#Top|Back to top]]''' | |||
::[http://petrowiki.org/Category:1.12_Drilling_measurement,__data_acquisition_and_automation 1.12 Drilling measurement, data acquisition and automation] | ::[http://petrowiki.org/Category:1.12_Drilling_measurement,__data_acquisition_and_automation 1.12 Drilling measurement, data acquisition and automation] | ||
Line 175: | Line 175: | ||
:[http://petrowiki.org/Category:1.14_Fundamental_research_in_drilling 1.14 Fundamental research in drilling] | :[http://petrowiki.org/Category:1.14_Fundamental_research_in_drilling 1.14 Fundamental research in drilling] | ||
'''[[#Top|Back to top]]''' | |||
==Well completions== | ==Well completions== | ||
Line 203: | Line 203: | ||
::[http://petrowiki.org/Category:2.2.2_Downhole_tools_and_equipment 2.2.2 Downhole tools and equipment] | ::[http://petrowiki.org/Category:2.2.2_Downhole_tools_and_equipment 2.2.2 Downhole tools and equipment] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:2.3_Well_monitoring_systems_or_intelligent_wells 2.3 Well monitoring systems or intelligent wells] | :[http://petrowiki.org/Category:2.3_Well_monitoring_systems_or_intelligent_wells 2.3 Well monitoring systems or intelligent wells] | ||
Line 235: | Line 235: | ||
:[http://petrowiki.org/Category:2.6_Fundamental_research_in_well_completion 2.6 Fundamental research in well completion] | :[http://petrowiki.org/Category:2.6_Fundamental_research_in_well_completion 2.6 Fundamental research in well completion] | ||
'''[[#Top|Back to top]]''' | |||
==Production and well operations== | ==Production and well operations== | ||
Line 279: | Line 279: | ||
::[http://petrowiki.org/Category:3.2.9_Lifecycle_management_and_planning_ 3.2.9 Lifecycle management and planning ] | ::[http://petrowiki.org/Category:3.2.9_Lifecycle_management_and_planning_ 3.2.9 Lifecycle management and planning ] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:3.3_Well_and_reservoir_surveillance_and_monitoring 3.3 Well and reservoir surveillance and monitoring ] | :[http://petrowiki.org/Category:3.3_Well_and_reservoir_surveillance_and_monitoring 3.3 Well and reservoir surveillance and monitoring ] | ||
Line 343: | Line 343: | ||
::[http://petrowiki.org/Category:4.1.12_HSE_considerations_in_facilities_design 4.1.12 HSE considerations in facilities design] | ::[http://petrowiki.org/Category:4.1.12_HSE_considerations_in_facilities_design 4.1.12 HSE considerations in facilities design] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:4.2_Pipelines,_flowlines_and_risers 4.2 Pipelines, flowlines and risers] | :[http://petrowiki.org/Category:4.2_Pipelines,_flowlines_and_risers 4.2 Pipelines, flowlines and risers] | ||
Line 365: | Line 365: | ||
::[http://petrowiki.org/Category:4.3.3_Solids 4.3.3 Solids ] (scale, sand, etc.) | ::[http://petrowiki.org/Category:4.3.3_Solids 4.3.3 Solids ] (scale, sand, etc.) | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:4.4_Measurement_and_control 4.4 Measurement and control] | :[http://petrowiki.org/Category:4.4_Measurement_and_control 4.4 Measurement and control] | ||
Line 401: | Line 401: | ||
::[http://petrowiki.org/Category:4.5.10_Remotely_operated_vehicles 4.5.10 Remotely operated vehicles] | ::[http://petrowiki.org/Category:4.5.10_Remotely_operated_vehicles 4.5.10 Remotely operated vehicles] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:4.6_Natural_gas_conversion_and_storage 4.6 Natural gas conversion and storage] | :[http://petrowiki.org/Category:4.6_Natural_gas_conversion_and_storage 4.6 Natural gas conversion and storage] | ||
Line 439: | Line 439: | ||
::[http://petrowiki.org/Category:4.8.8_HSE_considerations_in_facilities_construction 4.8.8 HSE considerations in facilities construction] | ::[http://petrowiki.org/Category:4.8.8_HSE_considerations_in_facilities_construction 4.8.8 HSE considerations in facilities construction] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:4.9_Facilities_operations 4.9 Facilities operations] | :[http://petrowiki.org/Category:4.9_Facilities_operations 4.9 Facilities operations] | ||
Line 461: | Line 461: | ||
::[http://petrowiki.org/Category:4.11.1_Corrosion_research 4.11.1 Corrosion research] | ::[http://petrowiki.org/Category:4.11.1_Corrosion_research 4.11.1 Corrosion research] | ||
'''[[#Top|Back to top]]''' | |||
==Reservoir description and dynamics == | ==Reservoir description and dynamics == | ||
Line 489: | Line 489: | ||
::[http://petrowiki.org/Category:5.1.10_Reservoir_geomechanics 5.1.10 Reservoir geomechanics] | ::[http://petrowiki.org/Category:5.1.10_Reservoir_geomechanics 5.1.10 Reservoir geomechanics] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:5.2_Fluid_characterization 5.2 Fluid characterization] | :[http://petrowiki.org/Category:5.2_Fluid_characterization 5.2 Fluid characterization] | ||
Line 551: | Line 551: | ||
::[http://petrowiki.org/Category:5.5.8_History_matching 5.5.8 History matching] | ::[http://petrowiki.org/Category:5.5.8_History_matching 5.5.8 History matching] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:5.6_Formation_evaluation_and_management 5.6 Formation evaluation and management] | :[http://petrowiki.org/Category:5.6_Formation_evaluation_and_management 5.6 Formation evaluation and management] | ||
Line 591: | Line 591: | ||
::[http://petrowiki.org/Category:5.7.6_Reserves_classification 5.7.6 Reserves classification] | ::[http://petrowiki.org/Category:5.7.6_Reserves_classification 5.7.6 Reserves classification] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:5.8_Unconventional_and_complex_reservoirs 5.8 Unconventional and complex reservoirs] | :[http://petrowiki.org/Category:5.8_Unconventional_and_complex_reservoirs 5.8 Unconventional and complex reservoirs] | ||
Line 627: | Line 627: | ||
:[http://petrowiki.org/Category:5.11_Fundamental_research_in_reservoir_description_and_dynamics 5.11 Fundamental research in reservoir description and dynamics] | :[http://petrowiki.org/Category:5.11_Fundamental_research_in_reservoir_description_and_dynamics 5.11 Fundamental research in reservoir description and dynamics] | ||
'''[[#Top|Back to top]]''' | |||
==Health, safety, security, environment and social responsibility== | ==Health, safety, security, environment and social responsibility== | ||
Line 665: | Line 665: | ||
::[http://petrowiki.org/Category:6.2.8_Ergonomics 6.2.8 Ergonomics] | ::[http://petrowiki.org/Category:6.2.8_Ergonomics 6.2.8 Ergonomics] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:6.3_Safety 6.3 Safety] | :[http://petrowiki.org/Category:6.3_Safety 6.3 Safety] | ||
Line 691: | Line 691: | ||
::[http://petrowiki.org/Category:6.4.3_Data_and_communications_security 6.4.3 Data and communications security] | ::[http://petrowiki.org/Category:6.4.3_Data_and_communications_security 6.4.3 Data and communications security] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:6.5_Environment 6.5 Environment] | :[http://petrowiki.org/Category:6.5_Environment 6.5 Environment] | ||
Line 725: | Line 725: | ||
:[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSSE 6.7 Fundamental research in HSSE] | :[http://petrowiki.org/Category:6.7_Fundamental_research_in_HSSE 6.7 Fundamental research in HSSE] | ||
'''[[#Top|Back to top]]''' | |||
==Management and information== | ==Management and information== | ||
Line 753: | Line 753: | ||
::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ::[http://petrowiki.org/Category:7.1.10_Capital_budgeting_and_project_selection 7.1.10 Capital budgeting and project selection] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:7.2_Risk_management_and_decision_making 7.2 Risk management and decision making] | :[http://petrowiki.org/Category:7.2_Risk_management_and_decision_making 7.2 Risk management and decision making] | ||
Line 775: | Line 775: | ||
::[http://petrowiki.org/Category:7.3.3_Project_management 7.3.3 Project management ] | ::[http://petrowiki.org/Category:7.3.3_Project_management 7.3.3 Project management ] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:7.4_Energy_economics 7.4 Energy economics] | :[http://petrowiki.org/Category:7.4_Energy_economics 7.4 Energy economics] | ||
Line 803: | Line 803: | ||
::[http://petrowiki.org/Category:7.5.5_Communities_of_practice 7.5.5 Communities of practice] | ::[http://petrowiki.org/Category:7.5.5_Communities_of_practice 7.5.5 Communities of practice] | ||
'''[[#Top|Back to top]]''' | |||
:[http://petrowiki.org/Category:7.6_Information_management_and_systems 7.6 Information management and systems ] | :[http://petrowiki.org/Category:7.6_Information_management_and_systems 7.6 Information management and systems ] | ||
Line 829: | Line 829: | ||
::[http://petrowiki.org/Category:7.7.3_New_technology_funding 7.7.3 New technology funding] | ::[http://petrowiki.org/Category:7.7.3_New_technology_funding 7.7.3 New technology funding] | ||
'''[[#Top|Back to top]]''' |
Revision as of 13:41, 19 November 2014
Well drilling
- 1.10.1 Drill string components and drilling tools (tubulars, jars, subs, stabilisers, reamers, etc)
- 1.11.2 Drilling fluid selection and formulation (chemistry, properties)
- 1.13.3 Cement formulation (chemistry, properties)
Well completions
- 2.5.2 Fracturing materials (fluids, proppant)
Production and well operations
- 3.2.2 Downhole intervention and remediation (including wireline and coiled tubing)
- 3.4.3 Corrosion inhibition and management (including H2S and CO2)
Facilities design, construction and operation
- 4.3.2 Precipitates (paraffin, asphaltenes, etc.)
- 4.3.3 Solids (scale, sand, etc.)
Reservoir description and dynamics
- 5.6.7 Formation test analysis (e.g., wireline, LWD)
- 5.6.10 Seismic monitoring (four dimensional)
Health, safety, security, environment and social responsibility
- 6.2.6 Infectious diseases (HIV/AIDS, malaria, tuberculosis)
- 6.3.1 Human factors (engineering and behavioral aspects)