You must log in to edit PetroWiki. Help with editing

Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. SPE disclaims any and all liability for your use of such content. More information


Glossary:HPHT

PetroWiki
Jump to navigation Jump to search

High pressure, high temperature. HPHT is where the undisturbed bottom hole temp at prospective reservoir depth or total depth is greater than 300oF or 150oC, and either the maximum anticipated pore pressure of any porous formation to be drilled through exceeds a hydrostatic gradient of 0.8 psi/ft, or a well requiring pressure control equipment with a rated working pressure in excess of 10000 psi.